Windy Gap Firming Project: Larimer County offerred tours of the site for the proposed Chimney Hollow Reservoir this summer

August 31, 2012

chimneyhollowreservoir.jpg

Here’s a report from the Loveland Reporter-Herald (Pamela Dickman). Click through for the photo slide show. Here’s an excerpt:

Four times this summer, the county and Northern Water have opened the land — 1,847 acres purchased in 2004 by Larimer County with open space sales tax and a Great Outdoors Colorado grant and by Northern Water — to residents through a tour.

The trek winds past two old homesteads, through meadows and into mountainous areas, through protected ground and sunny slopes. The scenery ranges from cottonwoods to pines with grasses and wildflowers filling the gap. A lone deer, wild turkeys and a rattlesnake made appearances during a recent tour, but signs of larger creatures abound — scat, areas where bear have snuggled down under a tree and the bones of large prey.

Much of the beauty will be covered with water, but the western edge will be open to recreation and improved for the wildlife that call the habitat home.

More Windy Gap Firming Project coverage here and here.


Morgan County dairy tour highlights importance of water to agriculture

August 30, 2012

organicdairycows.jpg

From The Fort Morgan Times (John La Porte):

Lawyers, Front Range city council members, a grain elevator operator, water purification company executives and a power company representative were among the others making the trip.

The group also heard from Joe Frank of the Lower South Platte Water Conservancy District about efforts by people from Kersey to the Colorado-Nebraska state line to work together and better manage water, particularly augmentation plans.
The group would like to partner with some Front Range municipalities to do some leases and exchanges of water instead of the “buy and dry” philosophy some Front Range entities are pursuing…

Morgan County Quality Water District started in the mid-1970s from efforts by dairy farmers Paul McDill and Bob Samples to get better water for their cattle, Kip Barthlama of the district’s board of directors said.

Water quality gets worse as one moves downstream along the Platte, it was noted. Frank pointed out that Sterling is in the process of building a $30 million reverse osmosis plant.

More South Platte River Basin coverage here and here.


Final Preliminary Alternatives Development Report on Grand Lake Now Available

August 24, 2012

grandlake.jpg

Here’s the release from the U.S. Bureau of Reclamation (Kara Lamb):

The Bureau of Reclamation has finalized its Colorado-Big Thompson Project West Slope Collection Preliminary Alternatives Development Report that addresses concerns of water clarity at Colorado’s Grand Lake. The report is available at http://www.usbr.gov/gp/ecao.

“The Department of the Interior is prioritizing efforts to improve water quality conditions in Grand Lake,” said Assistant Secretary for Water and Science Anne Castle. “The Bureau of Reclamation, Interior’s water management agency, is committed to protecting the aesthetic values of Grand Lake and maintaining a secure water supply for its customers. We recognize the problem and are working hard with state and local leaders to understand the causes and find appropriate solutions.”

Grand Lake is part of the Colorado-Big Thompson Project’s West Slope collection system, which diverts water under the Continental Divide to Colorado’s East Slope and Front Range. A proposed state of Colorado water standard for the lake is scheduled to take effect in 2015. The Preliminary Alternatives Development Report is the first step toward improving water quality in Grand Lake in an effort to meet this state standard and improve this resource for its many uses. Four alternatives are considered in the report ranging from ceasing pumping during the summer season to building a bypass for project water to be delivered to the East Slope. The viability of each alternative is evaluated for a number of measures.

Reclamation continues to collaborate with water and power customers, stakeholders in and around Grand County, citizens groups around Grand Lake and Shadow Mountain Reservoir, recreation managers at affected water bodies and other local, state and federal agencies.

The final Alternatives Development Report has been provided directly to stakeholders and posted to Reclamation’s website for the general public. Next steps include the Technical Review, which begins this fall and completes in fall 2013, and will examine the technical and financial feasibility of the alternatives presented in the Alternatives Development Report.

To download the report in PDF, please visit www.usbr.gov/gp/ecao.

More Colorado-Big Thompson Project coverage here.


Northern Integrated Supply Project: Supplemental Draft EIS due Fall 2013

August 22, 2012

gladereservoirsitenorthernwater.jpg

Here’s an excerpt from a recent Northern Colorado Water Conservancy District eNews email:

Colorado Governor John Hickenlooper wrote a letter to the U.S. Army Corps of Engineers in May requesting an expeditious conclusion to the National Environmental Policy Act study being conducted by the Army Corps for the Northern Integrated Supply Project.

In a response to the governor, Corps of Engineers Colonel Robert Ruch, responded that his agency anticipates the Supplemental Draft EIS for NISP will be released to the public in the Fall of 2013. “The size of the proposals, types of analyses, and the amount of interest they have generated has resulted in substantial reviews,” Colonel Ruch wrote. “Please be assured that I have made the review of all ongoing water supply actions in the Omaha District’s purview a high priority for my Regulatory staff.”

This was positive news on many fronts. First, is that a definite date for the release of the SDEIS has been given. The SDEIS process began in February 2009. Second, having Gov. Hickenlooper weigh in on the project is enormous. While not an endorsement, his insistence that the studies be brought to conclusion and his affirmation that wise water development, including projects like NISP, are a necessity in Colorado, was welcome indeed.

The Governor also referenced the ongoing drought in Colorado and the pressing need for water for NISP water providers. He also committed the State to moving through their approval process in a timely manner.

Governor Hickenlooper also wrote a letter to President Obama where he addressed Denver Water’s Moffat Enlargement Project and its ongoing permitting process.

In the letter he states, “Colorado is at a critical juncture in forging a more secure future for the development and management of water supplies critical to both our economy and the natural environment that makes our state so great.” Governor Hickenlooper added, “Therefore, we urge you to exercise your authority to coordinate your agencies and bring an expeditious conclusion to the federal permitting processes for this essential project, in order that we can have certainty moving forward as a state.”

More Northern Integrated Supply Project coverage here and here


Governor Hickenlooper requests speedier reviews for Moffat Collection System and NISP

August 15, 2012

nisppreferredalternative.jpg

windygapmoffatfirmingboulderviewpoint.jpg

From The Denver Post (Bruce Finley):

A letter to Obama seeks help spurring decisions on Denver Water’s diversion of 18,000 acre-feet of Colorado River Basin water from the west side of the Continental Divide to an expanded Gross Reservoir west of Boulder. A separate letter to the U.S. Army Corps of Engineers asks that the Northern Integrated Supply Project — which would siphon the Cache la Poudre River into new reservoirs storing 215,000 acre-feet of water — be given a high priority.

Colorado faces “a significant gap in our supplies to provide water for future growth — a gap that cannot be met by conservation and efficiencies alone,” Hickenlooper began in a June 5 letter sent to the White House and copied to cabinet secretaries and agency chiefs. “We urge you to exercise your authority to coordinate your agencies and bring an expeditious conclusion to the federal permitting processes for this essential project, in order that we can have certainty moving forward as a state,” he wrote.

Click here to read the letter to President Obama. Click here to read the Governor’s letter to the U.S. Army Corps of Engineers.

More Moffat Collection System Project coverage here. More Windy Gap Firming Project coverage here.


NISP: ‘…from 2009 to 2011, more than 1 million acre-feet of water left the state’ — Hank Brown

August 14, 2012

nisppreferredalternative.jpg

Here’s a guest column arguing the necessity of the Northern Integrated Supply Project (NISP) to keep Front Range cities from drying up more irrigated agricultural land, written by Hank Brown, running in The Denver Post. Here’s an excerpt:

Taking water used by agriculture for new homes involves drying up thousands of acres of our most productive irrigated farms. The result will be higher temperatures in the summer, more carbon dioxide in our atmosphere, and the loss of food and fiber production in Colorado.

What is the answer? The Northern Integrated Supply Project (NISP) is being proposed by northern Colorado cities and water districts to save for Colorado thousands of acre-feet of water that is now being lost to Nebraska. The water belongs to Colorado under the federally recognized interstate compact, yet from 2009 to 2011, more than 1 million acre-feet of water left the state — water the state had rights to use.

What will the project do for our environment? It will improve minimum stream flow, protect against flood and drought, and help prevent the drying up of our farm land. Without NISP, environmental studies estimate that an additional 100 square miles of northern Colorado farmland will be dried up.

More Northern Integrated Supply Project coverage here and here.


Windy Gap Firming Project: ‘No bypass or increased flushing flows, no permit’ — Kirk Klancke

August 9, 2012

windygapmoffatfirmingboulderviewpoint.jpg

From the Sky-Hi Daily News (Reid Tulley):

The hearing gave all of the interested parties a chance to voice their opinions and concerns about the project before it was submitted to the Grand County Commissioners for approval or denial.

Enhancements and mitigations to the Colorado River, Grand Lake, and Willow Creek are part of the proposed agreement and include a bypass around Windy Gap Reservoir, larger flushing flows for the Upper Colorado River, and a list of other possible mitigation measures.

Planned mitigation measures

The existing diversions at Windy Gap take 60 percent of native flows out of the Upper Colorado and the proposed expansion to the project would take another estimated 15-20 percent of flows, according to Trout Unlimited.

“Under present plans, expanding Windy Gap would make a bad situation worse because it would increase periods of low flows and significantly reduce runoff, which is critical to clean the river of excess silt and sediment contributed by Windy Gap Reservoir,” said Amelia Whiting, counsel for TU’s Colorado Water Project.

Mitigations and enhancements meant to address the impacts are proposed in the agreement for the Colorado River, Grand Lake, and Willow Creek.

“We are not opposed to this project, we just want to see the right mitigations take place,” said Kirk Klancke, president of the Headwaters of the Colorado chapter of Trout Unlimited. “No bypass or increased flushing flows, no permit.”

The enhancements that are proposed were the main topic of discussion during the meeting as interested parties made arguments for specific mitigation’s and enhancements.

Each party agreed that the river would be better off with the proposed mitigations and enhancements than it would be without them. However, the parties differed about which mitigations should take priority.

Some of the parties who voiced their opinions about the proposed mitigation’s and enhancements include the Upper Colorado River Alliance, Trout Unlimited, Colorado River Water Conservation District, the Town of Grand Lake, and members of the public.

Some of the main enhancements that are proposed are the construction of a bypass around or through Windy Gap Reservoir and increased flushing flows to the Colorado, which would help to restore the habitat of the gold-medal fishing waters below the Windy Gap Dam.

More Windy Gap coverage here and here.


Windy Gap Firming Project: Grand County Commissioners’ public hearing recap

August 7, 2012

coloradorivergranby.jpg

From the Sky-Hi Daily News (Reid Tulley):

The hearing drew a full crowd comprised of invested and concerned parties to the Grand County Board of Commissioners meeting room during the two days. Testimony was presented by a number of interested parties about the negative environmental impacts Windy Gap Reservoir has had on the Upper Colorado River as well as the possible mitigations and enhancements to the river that could take place if the commissioners approve the permit with those conditions attached.

Denver Water offered an additional $1 million to the downriver mitigation and enhancement fund, which in turn would be used by the Municipal Subdistrict of the Northern Colorado Water Conservancy District toward the construction of the bypass around Windy Gap Reservoir.

The Subdistrict has pledged $250,000 to research the bypass, which would be conducted immediately after the approval of the permit by the commissioners. If it is found that the bypass would benefit the Colorado River, construction of the bypass would start immediately and the Subdistrict would put a total of $3 million toward the project, including the $1 million pledged by Denver Water.

A condition of the agreement of the Subdistrict to apply funds toward the construction of the bypass would be that construction of Chimney Hollow Reservoir would start at the same time they apply the funds and that this would be an endpoint to the permit process…

Increased flushing flows are a proposed part of the agreement and are set at a minimum of 600 cubic feet per second…

The Grand County staff members who worked on this agreement recommended that the board of commissioners approve the permit. The commissioners have 120 days to take the 1041 permit agreement under advisement and to provide the Subdistrict with an answer.

More Windy Gap coverage here and here.


Drought news: Drought helps proponents of the NISP make their point about storage

August 7, 2012

nisp2.jpg

Here’s an in-depth look at the current state of the Northern Integrated Supply Project from Bobby Magill writing for the Fort Collins Coloradoan. Click through and read the whole article. Here’s an excerpt:

…the 2012 drought has brought an often breathless sense of urgency to the debate over the need for the big alternative to damming up Poudre Canyon – a massive dam building project called NISP that would siphon water from the Poudre River and turn a valley on U.S. Highway 287 north of Fort Collins into Glade Reservoir – a lake bigger than Horsetooth Reservoir.

The drought proves that Northern Colorado still needs to find “buckets” in which to store water during wet years so the region can have a water savings account for years like this one, said Brian Werner, spokesman for the Northern Colorado Water Conservancy District, NISP’s mastermind and chief advocate…

“The current drought throughout Northern Colorado has brought home a stark reality — we need more water storage and soon! Without it, our children’s and grandchildren’s future will be at risk,” Weld County Commissioner Sean Conway wrote in the Windsor Beacon on July 17. He warned that a Colorado without NISP would be a Colorado with 100 fewer square miles of irrigated farmland in Weld and Larimer counties. It would be an economic and environmental disaster, he said…

“You can conserve only so much,” [State Sen. Mary Hodge of Brighton] said. “When you conserve as much as humanly possible you don’t leave yourself room for a year (like) you have now.” The bottom line, she said, is that the Front Range isn’t going to stop growing, and all those new Windsorites, Erieans, and Frederickers must have access to more water.

Perhaps to illustrate the political peril surrounding NISP, Gov. John Hickenlooper‘s administration has no official position on the project except to say that it encourages water projects to have “multiple benefits.” NISP has those benefits, and the state hopes that the Army Corps has prioritized its review of the project, Hickenlooper wrote in a May letter to the Army Corps. “The governor has not endorsed NISP,” Hickenlooper’s special water policy advisor John Stulp said Thursday, adding, “There’s no question about when we have a drought that we start looking at what our options might be to help minimize the impacts of future drought.”[...]

As the river’s spring flows would be heavily reduced, more than 2,700 acres of native plant communities would be lost, the Army Corps concluded in its draft environmental review. The city of Fort Collins worries water quality in Horsetooth Reservoir could be degraded by a pipeline sending Glade water into Horsetooth Reservoir, possibly costing the city millions in capital costs to ensure the quality of its drinking water is maintained depending on how much water is transferred between reservoirs. And, in addition to harm city natural areas along the Poudre could suffer if the river is diminished, the city could have to spend in excess of $125 million to upgrade its water treatment facilities to protect the river…

…the era of big dam proposals on the Poudre River evaporated decades ago after Congress protected a long stretch of the river as wild and scenic in 1986, effectively canceling the Cache la Poudre Project, a proposal to build a chain of reservoirs throughout Poudre Canyon. A later plan to build a dam lower in the canyon was also scuttled…

…even Poudre River advocates are divided on NISP and Glade. “NISP is the natural outgrowth (of the fact that) we didn’t build a dam on the main stem at Grey Mountain,” said Bill Sears, president of Friends of the Poudre, who said the primary concern in the 1980s was to ensure that the values of a free-flowing river in Poudre Canyon trumped the value in storing water there. But now that the canyon is protected, “the need for water storage doesn’t go away,” he said. “So, where are you going to put it? “To their credit, Northern has scoured the area thoroughly,” he said. “I think they make their case for Glade, but until the Corps of Engineers makes their final ruling, I’m hesitant to make a hard and fast stand.”

From The Denver Post (Joey Bunch):

Tuesday’s forecast high of 92 degrees could be as cool as it gets in the city for a week, according to the National Weather Service office in Denver. The drought-parched Eastern Plains have a slight of rain, but “precipitation amounts will generally be light,” forecasters said Monday. Western Colorado could see slightly cooler temperatures this week, with highs in the low 80s in Steamboat Springs and Durango, and in the 70s in Aspen, according to the weather service.

All of Colorado remains in a severe, extreme or exceptional drought, according to the federal government’s U.S. Drought Monitor. After the hottest July on record in Denver, when temperatures were 4.7 degrees hotter than usual, August so far is 2.7 degrees above average.

More Northern Integrated Supply Project coverage here and here.


Windy Gap Firming Project public hearing recap: Northern pledges dough to study reservoir bypass

August 6, 2012

windygapmoffatfirmingboulderviewpoint.jpg

From The Denver Post (Scott Willoughby):

Two days of public hearings opening comment on the proposal to expand the Northern Water Conservancy District’s transmountain diversion built around the 445-acre-foot reservoir near Granby drew a crowd to Hot Sulphur Springs last week. As has become the norm in the lengthy process, much emphasis was placed on the negative environmental impacts Windy Gap Reservoir already has had on the upper Colorado River and potential ways to fix the problem. The stretch of river directly below Windy Gap Reservoir is considered the least healthy portion of the upper Colorado because of impacts of the dam used to capture river water pumped across the Continental Divide via the Colorado-Big Thompson Project. State studies show a sharp decline in river health since the construction of Windy Gap, attributing increased water temperatures, algae and sediment to the reservoir.

The proposal facing Grand County commissioners seeks to remove another 15 percent to 20 percent of river flows on top of about 60 percent of native flows already being removed from the upper Colorado…

“Under present plans, expanding Windy Gap would make a bad situation worse because it would increase periods of low flows and significantly reduce runoff, which is critical to clean the river of excess silt and sediment contributed by Windy Gap Reservoir,” said Mely Whiting, counsel for Trout Unlimited’s Colorado Water Project. “Grand County must press Northern to build the bypass.”
In addition to the bypass, Whiting and TU advocate increased minimum flows and regular flushing flows to cleanse the river bottom, among other measures.

Northern Water has pledged $250,000 to research the bypass. If it is found beneficial, Northern would put an additional $2 million toward construction along with $1 million pledged by Denver Water. The permit process would end and construction of Chimney Hollow Reservoir near Fort Collins would begin as a condition of the agreement to put the money toward a bypass.

More Windy Gap Firming Project coverage here and here.


Windy Gap Firming Project: Chimney Hollow Reservoir site tour August 23

August 2, 2012

windygapmoffatfirmingboulderviewpoint.jpg

From Larimer County via the Loveland Reporter-Herald:

By popular demand, Larimer County Natural Resources and Northern Water has planned another field trip to the Chimney Hollow Open Space in the Blue Mountain Conservation Area, which is not currently open to the public.

The next tour will be offered at 9 a.m. to noon Thursday, Aug. 23.

The field trip will include an easy, round-trip walk of 0.5 mile for the whole group. After learning about the Windy Gap Firming Project’s proposed Chimney Hollow Reservoir and the Chimney Hollow property, the group will split up, and one group will have an opportunity to hike farther, and the other group will receive a historical interpretive tour of the property.

The tour is free, but space is limited. Register at larimer.org/naturalresources/registration.

More Windy Gap coverage here and here.


The Grand County Commissioners are pondering the Windy Gap Firming Project 1041 permit this week

August 1, 2012

windygapmoffatfirmingboulderviewpoint.jpg

From the Summit County Citizens Voice (Bob Berwyn):

The Windy Gap Project consists of a diversion dam on the Colorado River, a 445-acre-foot reservoir, a pumping plant, and a six-mile pipeline to Lake Granby. Windy Gap water is pumped and stored in Lake Granby before it is delivered to water users via the Colorado-Big Thompson Project’s East Slope distribution system…

“The Upper Colorado River is under severe stress from multiple impacts, from drought to diversions,” said Kirk Klancke, president of Trout Unlimited’s Headwaters chapter. “This is the last best opportunity for Grand County officials to push for stronger protections to ensure that the Windy Gap project doesn’t destroy the health of our rivers.”[...]

The Grand County Commissioners are currently accepting comments and have scheduled a two-day hearing in Hot Sulphur Springs that will include public testimony on August 1-2…

State studies show that the Upper Colorado below Windy Gap Reservoir has suffered a sharp decline since the construction of the reservoir , including an almost total loss of once-plentiful stoneflies and mottled sculpin — key aquatic species that are an important link in the food chain for trout and other fish. The studies point to the reservoir’s contribution of silt combined with a lack of healthy flows, which has caused a spike in water temperatures, algae, sediment and other negative impacts on river and fishery health.

More Colorado River Basin coverage here and here.


Drought/precipitation news: Horsestooth Reservoir levels dropping, marina prepares to close

July 31, 2012

horsetoothreservoir1.jpg

From the Northern Colorado Business Report (Steve Lynn):

Water levels are dropping so fast that owners of about 300 boats docked at the Inlet Bay Marina at Horsetooth Reservoir will have to remove their vessels earlier than normal…

The reservoir was 34 feet below capacity Monday and could drop another 16 feet by the end of August, said Brian Werner, spokesman for the Northern Colorado Water Conservancy District. Water levels are decreasing from a few inches to a foot daily as farmers and cities draw on their allotments from the Colorado-Big Thompson Project.

Water levels are about 5 percent below average as farmers and cities contend with the ongoing drought, Werner said. The effects of the High Park Fire on the Poudre River also have led the city of Greeley to use more reservoir water than it normally would this time of year.

More Colorado-Big Thompson Project coverage here.

From Steamboat Today (Scott Franz):

The 3.05 inches Steamboat measured so far this month is nearly double the city’s historic average of 1.61 inches of rain for July…

The Yampa River, bolstered by the recent storms and continued release of water from Stagecoach Reservoir, was flowing at 117 cubic feet per second under the Fifth Street Bridge on Sunday afternoon. The recent abundance of rainfall also has spurred some Northwest Colorado fire officials to call for easing the Stage 2 fire restrictions that have been in place in Routt County since late last month.


Save the Poudre/Poudre Waterkeeper plans ‘Restore the Corridor’ effort to improve river ecological health through Fort Collins

July 30, 2012

cachelapoudre.jpg

From the Fort Collins Coloradoan (Kevin Duggan):

It plans to do that through a campaign called “Restore the Corridor” and dogged activism when reviewing development proposals, working to restore wildlife habitat and promoting recreational opportunities, said executive director Gary Wockner.

The group doesn’t expect to be the only “voice” for the river when it comes to determining what happens around it, said Mark Easter, Save the Poudre board of directors chairman. But somebody has to speak out when it comes to guarding the river’s health, he said, adding many community groups have an interest in what happens along the Poudre…

But critics worry the nonprofit will use its political muscle to sink all development projects along the river. Save the Poudre last month filed two appeals of projects that were approved through Fort Collins’ planning process…

“(Wockner) is saying ‘no’ to everything, across the board,” [Gino Campana, owner of Bellisimo Inc.] said. “I believe there is not a solution we can engineer to satisfy Save the Poudre.” Conceptual plans for the project call for restoring riparian forest along sections of the property closest to the river. It’s the type of work city officials and Save the Poudre say they support, Campana said.

“We should be on the same side of the table,” he said. “He wants to be on the other side.”

Wockner declined to comment on Campana’s project until its development plans are formally submitted. The only item being contested at the moment is the density issue and its potential impact on wildlife, he said…

The Save the Poudre Coalition formed about six years ago to battle the proposed Northern Integrated Supply Project, or NISP, and Glade Reservoir. Glade would be built north of Ted’s Place and draw water from the Poudre…

Save the Poudre has a right to express its opinion and take action on any topic, [Jim Reidhead, a longtime local businessman and community activist] said. It is skilled at following legal processes such as appeals in making its case. But it appears to be determined to obstruct any type of development or water-storage project on the river, especially if it might promote growth.

More Cache la Poudre watershed coverage here.


Windy Gap Firming Project: Grand County 1041 permitting process underway #coriver

July 30, 2012

coloradorivergranby.jpg

From the Sky-Hi Daily News (Kirk Klancke):

The county is negotiating enhancements to help the degradation that we are already experiencing in the Colorado River below the Windy Gap reservoir but without additional mitigation for the new project, the enhancements will not solve all of the issues facing the river. We need to make sure that our elected officials here in Grand County require all of the mitigation needed to protect the Upper Colorado River below Windy Gap from the new Windy Gap Firming project.

This is our best opportunity as individuals to influence the permit process. This influence can be exercised through letters or emails to the commissioners or by attending the public hearings in the commissioners’ board room on Aug. 1 and 2…

This is your chance to influence the future of the headwaters of the Colorado River. If you were wondering what you could do to help, this is your best opportunity. Please write your letter and come to the hearing to speak.

Update: Here’s the release from Trout Unlimited (Randy Scholfield):

Trout Unlimited today urged the Board of County Commissioners of Grand County (BOCC) to deny a permit for the Windy Gap Firming Project unless the BOCC is willing to include protective measures to keep the Upper Colorado River and its gold-medal trout fishery alive.

“The Upper Colorado River is under severe stress from multiple impacts, from drought to diversions,” said Kirk Klancke, president of Trout Unlimited’s Headwaters chapter. “This is the last best opportunity for Grand County officials to push for stronger protections to ensure that the Windy Gap project doesn’t destroy the health of our rivers.”

He added, “Without stronger protections, this river faces a long, slow decline—and so do our communities, ranches and recreation economy. That’s just not acceptable. I want my grandchildren to be able to fish here and enjoy this river, as I have. I want our local businesses to thrive. I know that many other Grand County citizens feel the same way.”

The BOCC will soon decide whether to issue a 1041 permit for Northern Colorado Water Conservation District’s Windy Gap Firming Project (WGFP) and, if so, under what conditions. The BOCC is currently accepting public, written comments and has scheduled a two-day hearing in Hot Sulphur Springs that will include public testimony on August 1-2.

At present, Northern’s Windy Gap diversion is taking about 60 percent of flows out of the Upper Colorado and pumping it through the Continental Divide to Front Range communities. The proposed expansion of the project would take another 15-20 percent of flows, putting the river at a dangerous tipping point for aquatic life and ecosystem health. State studies show that the Upper Colorado below Windy Gap Reservoir has suffered a sharp decline since the construction of the reservoir , including an almost total loss of once-plentiful stoneflies and mottled sculpin—key aquatic species that make up an important link in the food chain for trout and other fish. The studies point to the reservoir’s contribution of silt combined with a lack of healthy flows, which has caused a spike in water temperatures, algae, sediment and other negative impacts on river and fishery health.

“Under present plans, expanding Windy Gap would make a bad situation worse because it would increase periods of low flows and significantly reduce runoff, which is critical to clean the river of excess silt and sediment contributed by Windy Gap Reservoir,” said Mely Whiting, counsel for TU’s Colorado Water Project.

According to a recent Colorado Parks and Wildlife report, construction of a bypass around Windy Gap reservoir and maintenance of adequate runoff are essential. “Without a bypass, it’s hard to see how the river can remain healthy when even more flows will be taken out,” said Whiting. “Grand County must press Northern to build the bypass.”

TU called on the BOCC to include several requirements in the permit, including:

- Northern should stop Windy Gap pumping when stream temperatures approach State acute and chronic standards.
- Northern should be required to not only study a bypass channel around the Windy Gap Reservoir, but also build it if the study determines that a bypass is beneficial.
- Northern must work with Grand County to monitor spring river flows and provide an adequate flushing flow to prevent sediment from collecting in the river bed and smothering aquatic habitat.
- Northern must fund a robust stream monitoring program that can accurately track the health of the aquatic species in the river and react to any declines that can’t be explained by normal fluctuation.

Trout Unlimited will present testimony at the BOCC public hearings in Hot Sulphur Springs on Aug. 1-2.

More Colorado River Basin coverage here and here.


High Park Fire: The NRCS, et. al., have started restoration efforts above Horsetooth Reservoir

July 29, 2012

strawdroppedbyhelicoptersoldiercanyonhighparkfire.jpg

From the Longmont Times-Call (Pamela Dickman):

All told Thursday and Friday, the team planted 1,120 pounds of grass seed across 40 acres and covered it with 105 bales of agricultural straw and wood chips — a layered approach to protecting the nearby glistening waters from the ash and debris of the High Park Fire…

The ash and debris have already blackened much of the Poudre River, so Fort Collins, Greeley and the Tri-Districts (North Weld County, Fort Collins-Loveland and East Larimer County water districts) have instead been pulling water for their customers from Horsetooth Reservoir. The waters of Horsetooth remain clean, but the threat of fire pollution is real. When rains fall, the now barren Soldier Canyon could mirror a slip-and-slide, sending debris from the fire right into Horsetooth Reservoir — and the water supplies for Fort Collins, Greeley and the Tri-Districts.

From The Denver Post (Erin Udall):

By dropping a mix of seed and straw mulch on the area, Natural Resources Conservation Service (NRCS) officials hope to trigger plant growth and create a filter that will keep debris, erosion and sediment runoff from getting into the reservoir…

“Think of the Poudre (River) as the hose, and Horsetooth (Reservoir) as the bucket,” [NRCS district conservationist Todd Boldt] said, explaining that the river provides drinking water for more than 300,000 people in the area. “They rely on the hose, but when they can’t, they turn to the bucket. That’s why it’s crucial to maintain Horsetooth.”

Here’s the release from the Natural Resources Conservation Service (Todd Boldt):

Helicopters are hovering near Horsetooth Reservoir for a responsive, cooperative project to protect the reservoir’s water quality in the wake of the High Park Fire.

Helicopters are dropping an erosion control seed mix and straw mulching materials on about 40 acres that suffered the most soil burn severity within the 400-acre burn area in the Soldier Creek drainage, which sits in Lory State Park on the west side of Horsetooth Reservoir.

The helicopters, from contractor Western States Reclamation, will apply a seed mix of native species. The seeds are large, with the expectation that they will break through the fire-caused debris and establish roots without requiring much moisture. Helicopters will also drop straw mulch, then a layer of wood straw on top, to retain moisture, shelter the seed from the wind and provide soil erosion protection.

Experts expect the project to trigger plant growth in the Solider Creek area, creating a filter to prevent debris, erosion and sedimentation runoff into Horsetooth Reservoir, a key water source for area cities.

The Natural Resources Conservation Service is providing much of the technical and financial support for this $91,320 project, which is part of its Emergency Watershed Protection Program. Other sponsors are Northern Water, the cities of Greeley and Fort Collins, and the Tri-Districts (the North Weld County, Fort Collins-Loveland, and East Larimer County water districts).

The helicopters, which are staged within Lory State Park, first took off Thursday morning and will likely finish Saturday.

More restoration coverage here and here.


Supporters of the Northern Integrated Supply Project (NISP) rally in Fort Lupton

July 25, 2012

fortmorganrainbowbridge.jpg

From KUNC (Kirk Siegler):

“This isn’t a Republican or Democrat issue, this is a Colorado issue,” said Fort Lupton Mayor Tom Holton. The rally under the blistering sun took place at the Fort Lupton Historic site – an adobe replica of a fur-trading post along the South Platte River between Denver and Greeley…

Saving farms is one of the main arguments put forth by cities and districts like Left Hand backing the estimated $400 million NISP project. The idea being that if these cities and districts had their own water supplies, they wouldn’t have to buy up all the farmers’ water…

“There is no water left in our rivers and that’s what we have to come to grips with and find a new path forward,” [Gary Wockner] says…

Backers of NISP say other proposals floated by environmentalists such as water leasing from farms still won’t meet the region’s long-term needs.

From The Denver Post (Monte Whaley):

The Army Corps delivered its latest assessment in a letter to Gov. John Hickenlooper, who wanted to know when the impact statement would be completed. That’s a sign that Hickenlooper and the cities and towns that would benefit from NISP want the project done…

Northern Water is a chief proponent of NISP, which calls for the Cache La Poudre to be diverted during high-flow periods to fill two proposed reservoirs, Glade Reservoir northwest of Fort Collins and Galenton Reservoir east of Ault. The latest cost of the project is at $490 million. At least 15 northern Colorado water providers also back NISP, believing it will sustain them during times of drought…

However, a comprehensive review of NISP was expected to attract a similar review by the Corps, [Brian Werner] said. “We’ve never been held to a hard and fast deadline,” he said. “What I am hearing from the 15 communities and the governor, is ‘Hey, let’s get this thing done.’ “

From the Northern Colorado Business Report:

“The current drought throughout Northern Colorado has brought home a stark reality – we need more water storage and soon,” Weld County Commissioner Sean Conway has said. “Without it our children and grandchildren’s future will be at risk.”[...]

Meanwhile, Weld County farmers have struggled to maintain their crops during the drought. Crop insurance claims are up, people in the industry say, despite overflowing groundwater wells that remain shut off to Weld farmers.

The project “would provide the water storage we need to support Northern Colorado’s growing communities and provide protection to economies and families when the weather turns dry,” Rep. Cory Gardner said in a statement.

From the Fort Collins Coloradoan (Ashley Keesis-Wood):

During the July 16 work session, the [Windsor] town board spent some time refreshing itself on a topic that hasn’t gotten a lot of traction in the last couple of years: the status of the Northern Integrated Supply Project…

Windsor has been a player in Northern Water since its formation and is currently a 8.25 percent shareholder in the project…

The project will cost an estimated $500 million, and that cost will be borne by participants in the project, in proportion to the amount of water they’re requesting from NISP. Windsor’s share of water is 3,300 acre-feet, which comes to about $40 million. There are, Brouwer said, multiple ways to fund the project, including special bond financing, loans or upfront payment…

In short, [Carl Brouwer] said he hopes the project will be producing water by 2018. “Glade would be built and completed by then, and we’d be completely finished with all construction by 2022 or 2023,” Brouwer said. “We can postpone a phase or two as needed, depending on the financial capacity of the partners involved.”

Thus far, Windsor has contributed about $933,000 to the project. Once the project is online, Windsor and other participants will enter into allotment contracts where the shares of water become tangible assets that can be bought and sold within the boundaries of the Northern Water district…

The 3,300 acre-feet that Windsor is in for in NISP is enough water to basically double Windsor’s water allotment from the Colorado Big Thompson Project and its other water sources, allowing the town’s population to essentially double, as well.

Board member Don Thompson asked whether there were negative implications from buying town water from other sources. “We’re paying other entities to treat the water we already own,” said Dennis Wagner, engineering director. “We’re not buying water from other entities.”

More Northern Integrated Supply Project coverage here and here.


Northern Integrated Supply Project (NISP): The Corps of Engineers delays supplemental draft EIS until the fall of 2013

July 24, 2012

nisppreferredalternative.jpg

Here’s a release from Save The Pourdre/Poudre Waterkeeper (Gary Wockner):

On Friday, July 20, the U.S. Army Corps of Engineers informed Save The Poudre that the next draft of the Environmental Impact Statement (EIS) for the Northern Integrated Supply Project (NISP) and its Glade Reservoir would not be released to the public for at least another year — “Fall of 2013.” The information came in a letter from the Corps that was written to Governor Hickenlooper. The letter cites “concerns regarding cumulative impacts to the Cache la Poudre River.” The letter goes on to say, “The size of the proposals, types of analysis, and the amount of interest they have generated has resulted in substantial reviews.”

“This is great news for the Poudre River,” said Gary Wockner, Director of Save The Poudre. “This river-destroying scheme has now been delayed for 5 years with no end in sight.”

Save the Poudre has been relentlessly bird-dogging NISP. Over the last 18 months, Save the Poudre has sent the Corp 17 letters, reports, and documents demonstrating the need for more analysis in the NISP EIS, some of that specifically regarding cumulative impacts of NISP with other proposed projects in the basin.

While the next draft of the EIS may be released in the Fall of 2013, NISP has a vast array of hurdles to jump after that. For example:
1. The next draft of the EIS (called the “Supplement Draft” EIS) allows for another public comment period.
2. After that public comment period, the Corps must again consider those comments and re-analyze any significant concerns.
3. After that analysis, the Corps will release a “Final” EIS, which also allows for yet another public comment period and re-analysis of significant concerns.
4. Then NISP must apply for and receive several additional state and federal permits, which may have significant analysis involved, including from the State of Colorado Water Quality Control Division and the Colorado Department of Public Health and Environment.
5. Assuming all of those hurdles can be jumped, the Corps will then issue a “Record of Decision” (ROD).
6. After the ROD is released, then anyone can formally challenge the project in court, which could take years to resolve.

As one example of a similar process, the Animas-La Plata dam/reservoir project in southwest Colorado was recently completed after 40 years of permitting and court challenges. As another example, the “Two Forks” dam and reservoir proposal west of Denver on the South Platte River was never completed because it was denied by another federal agency because the project would have irrevocably harmed the river as opposed to alternatives such as increasing water conservation in the Denver metro area.

At a recent public meeting (as reported in Windsor Now), the spokesperson for NISP said he expected NISP to be completed in the year 2022, 10 years from now.

“Ten years is extreme optimism,” responded Gary Wockner. “Our mission is to protect and restore the Poudre River and NISP violates our mission. NISP participants need to invest in alternatives now — such as the “Healthy Rivers Alternative” which focuses on water conservation and efficiency — rather than throwing away more ratepayers’ money on NISP.”

More coverage from Monte Whaley writing for The Denver Post. From the article:

Werner said a recent decision by the U.S. Army Corps of Engineers to delay issuing its environmental impact statement for at least another year — sometime in fall 2013 — is not a sign the project is in trouble.
“We are at the mercy of the process, we’ve never been tied to a deadline,” Werner said The Army Corps delivered its latest assessment in a letter to Gov. John Hickenlooper, who wanted to know when the impact statement would be completed. That’s a sign that Hickenlooper and the cities and towns that would benefit from NISP want the project done…

…a comprehensive review of NISP was expected to attract a similar review by the Corps, Werner said. “We’ve never been held to a hard and fast deadline,” he said. “What I am hearing from the 15 communities and the governor, is ‘Hey, let’s get this thing done.’ “

More Northern Integrated Supply Project coverage here and here.


Boulder County approves and sets conditions for the 1041 permit for Northern Water’s Southern Water Supply Pipeline Project II

June 22, 2012

southernwatersupplyprojectnorthernwater.jpg

From the Boulder Daily Camera (John Fryar):

Boulder County commissioners on Thursday approved a proposed pipeline that will deliver water from Carter Lake in Larimer County to the city of Boulder, the Left Hand Water District, the Longs Peak Water District and the Town of Frederick.

But the Northern Colorado Water Conservancy District, which is heading up what’s called the Southern Water Supply Pipeline Project II on behalf of the entities that will be getting the water, will have to comply with nearly three dozen conditions that Boulder County is attaching to its approval. The project’s representatives expressed particular concerns about two of those conditions.

One, as recommended by Boulder County Land Use staff, will require the applicants to pay for a county-retained “project overseer” who’d monitor and inspect the work while it’s under way and would have the authority “to alter, direct and/or stop any activity that will result in adverse environmental or safety conditions” or violations of various county permits or “accepted construction standards.” Project proponents indicated discomfort over giving someone the ability to stop all work over issues they said could be resolved without bringing everything to a halt. County commissioners agreed to add language that the overseer couldn’t act arbitrarily. But they said some situations might require emergency work stoppages, rather than awaiting dispute resolution.

Pipeline project applicants also objected to a condition that they pay for the county Parks and Open Space Department to hire someone representing the county, as a landowner, during the project’s construction and reclamation work on county open space lands…

Northern Water’s Carl Brouwer, the project manager, said participants will now meet to work out a timetable for the phased construction of the pipeline, whose advocates have said is needed to improve the quality of the water being delivered, provide a year-round water supply and meet projected increases in demand. Brouwer said it’s been estimated that the work will about $35 million or more once it’s completed. At least some of the new underground pipeline will replace Northern Water’s and water recipients’ reliance of the portion of the current delivery system that channels water through exposed open-air canals that are closed in the winter and that can be polluted by storm runoffs and other surface sources. The new pipeline would run roughly in parallel to the old canal system between Carter Lake and a point near Longmont’s Vance Brand Municipal Airport. From there, it would run southwest to Boulder Reservoir. An eastern spur from the main pipeline would run from a point north of Longmont and go east to Frederick.

More infrastructure coverage here.


‘Oil shale development would involve intensive use of water’ — Alan Hamel

June 10, 2012

oilshaledepositscowyutblmostseis.jpg

From The Pueblo Chieftain (Chris Woodka):

“We have to protect the water we have, as well as provide water for endangered species,” said Alan Hamel, executive director of the Pueblo Board of Water Works and a member of the Colorado Water Conservation Board. “Oil shale development would involve intensive use of water, particularly for use in power generation.” Last month, the Pueblo water board and other members of the Front Range Water Council weighed in on the Bureau of Reclamation’s environmental impact statement for oil shale and tar sands…

The Front Range Water Council includes the major organizations that import water from the Colorado River: Denver Water, the Northern and Southeastern Colorado water conservancy districts, Aurora Water, Colorado Springs Utilities, Twin Lakes Reservoir and Canal Co. and the Pueblo water board. Collectively, they provide water to 4 million people, 82 percent of the population in Colorado.

More Front Range Water Council coverage here and here.


Carter Lake: The Northern Colorado Water Conservancy District dedicates their new hydroelectric generation facility

June 1, 2012

robertrouthydroelectricplantcarterlake05312012.jpg

From the Loveland Reporter-Herald (Pamela Dickman):

A hydroelectric plant is now up and running at Carter Lake west of Loveland and pumping energy into the Poudre Valley Rural Electric Association grid Dignitaries from Northern Water, which built the plant, the REA, Tri State Generation and even the United States Department of Interior on Thursday dedicated the Robert V. Trout Hydropower Plant not far from the south shore of the lake…

Already, the Colorado-Big Thompson Water that funnels through the Adams Tunnel from the Western Slope to Northern Colorado feed six Bureau of Reclamation hydroelectric power plants and has fed 37 billion kilowatt hours of electric energy into the grid. The new plant, owned and operated by Northern Water, will add 2.6 megawatts of power, or enough to feed 1,000 homes…

The water district named the plant after Trout, a lawyer who has represented the water district for 35 years and whose innovative and tireless efforts helped bring the hydroelectric plant to life.

Here’s the release from the Northern Colorado Water Conservancy District (Brian Werner):

Northern Water dedicated their first hydropower plant today at Carter Lake southwest of Loveland. About 100 people attended the ceremony, which featured Anne Castle, assistant secretary for water and science for the U.S. Department of the Interior, and speakers from several organizations involved in the project.

The project, which started generating power in mid-May, harnesses pressure created by existing releases from the outlet tower at the south end of Carter Lake, a Colorado-Big Thompson Project reservoir. The facility includes two 1,300-kilowatt turbines and connections to the Carter Lake outlet and the St. Vrain Supply Canal. It is expected to produce 7 to 10 million kilowatt-hours of clean energy a year – enough to power about 1,000 homes – sold by the Poudre Valley Rural Electric Association.

“Although the industry classifies this hydro project as small, it’s a really big step for Northern Water. We’re taking energy in the form of pressure that was already there and turning it into marketable power that expands Poudre Valley REA’s green energy portfolio,” said Carl Brouwer, project manager for Northern Water.

Northern Water’s Board of Directors approved a resolution earlier this month to name the facility the Robert V. Trout Hydropower Plant after attorney Bob Trout, Northern Water legal counsel for more than 35 years. Just as he was for countless other initiatives, Trout was instrumental in the development of the hydro project.

The $6 million project received a $2 million low-interest loan through the Colorado Water Resources and Power Development Authority, and Northern Water’s new hydropower enterprise fund is managing a loan for the rest. The project’s projected revenue, which will repay construction costs and cover future upgrades, is about $600,000 a year.

More hydroelectric coverage here and here.


Northern Integrated Supply Project (NISP): Storage is key to future growth

May 27, 2012

nisppreferredalternative.jpg

From the Boulder Daily Camera (Bob Juhl/Joseph A. Wilson/Carolyn Cutler):

Erie and Lafayette and the Left Hand Water District, which serves Eastern Boulder County, have spent the past decade studying the best methods to ensure our ability to access enough water to meet our future dry year needs. Together with 12 regional water providers, we determined that NISP is our best option from more than 200 options studied. NISP is not only the most environmentally sensitive project, but also the best solution from an economic standpoint.

Some believe the region will be fine without NISP. We wholeheartedly disagree. In fact, the Draft Environmental Impact Statement states clearly that if NISP is not built, one of the consequences will be the elimination of 100 square miles of irrigated farmland in Northern Colorado because communities will have to purchase necessary water supplies from farmers. One of NISP’s goals is to keep water on farms to ensure their continued operation.

Northern Colorado will continue to grow regardless of whether NISP is built or not. Colorado needs to keep available water supplies in the state for its citizens. From 2009 to 2011 Colorado saw more than 1.4 million acre feet of water leave the state to Nebraska over and above what is required. That’s enough water to supply the entire Front Range of Colorado with water for a year…

Please go to gladereservoir.org for more information about NISP and an upcoming support rally scheduled for July 24.

More Northern Integrated Supply Project coverage here and here.


Northern Water ups the Colorado-Big Thompson quota to 100%, lets hear it for storage

May 12, 2012

coloradobigthompsonprojecteastslopesystemncwcd.jpg

Here’s the release from the Northern Colorado Water Conservancy District (Brian Werner):

A 100 percent quota for Colorado-Big Thompson Project water was approved today by the Northern Water Board of Directors. Their decision bolsters this year’s C-BT water supplies by 31,000 acre feet with a 10 percent increase from the quota set in April.

Despite paltry snowpack and dismal streamflow forecasts, recent abundant water years replenished C-BT reservoirs enough to give directors the option to increase the quota for a second time this year, demonstrating the value of reservoir storage.

Directors based their decision on the agricultural community’s needs for more water as they plan for the crop-growing season. The board concluded that this is the type of year when a 100 percent quota is needed, based on record-low snowpack readings and streamflow forecasts similar to the drought of 2002.

“The smaller agricultural producers need this water this year,” said Don Magnuson, director from Weld County. “We have an obligation to take care of the little guys.”

The C-BT quota sets the percentage of an acre foot that a C-BT allottee will receive during the current water year for every unit of C-BT water the allottee owns. The 100 percent quota means that each unit will yield one acre foot. This is the tenth time the water year’s total quota has reached 100 percent in the C-BT Project’s 55-year history of full water deliveries.

From the Associated Press via CBSDenver.com:

On Friday, the district’s board of directors approved a 100 percent quota so that project allottees can collect a full acre-foot of water for every unit of project water that they own…District directors say they decided to boost the quota from 90 percent in April because they’re concerned about farmers who will need more water after a dry, mild winter.

More Colorado-Big Thompson Project coverage here.


Colorado TU Gives Conservation Award to Grand County

May 9, 2012

grandlake.jpg

Here’s the release from Colorado Trout Unlimited (Randy Scholfield):

Colorado Trout Unlimited today announced that Grand County government – led by County Commissioners Gary Bumgarner, James Newberry, and Nancy Stuart – is the recipient of TU’s 2012 Trout Conservation Award for its work protecting the Upper Colorado River watershed in the face of Front Range water diversions and other threats.

The award is presented each year to recognize outstanding achievements in conserving Colorado rivers and trout habitat.

“I have never seen a local government place the level of attention, resources, and overall emphasis on river conservation as has been the case with Grand County over the past five years,” said David Nickum, executive director of Colorado Trout Unlimited. “Commissioners Bumgarner, Newberry and Stuart, and County Manager Lurline Curran, have worked tirelessly to preserve healthy river flows along with the wildlife, local communities, and quality of life that depend on them. They have been true champions for the Colorado headwaters.”

“As a resident of Grand County for 40 years, and as a father who wants his children and their children to experience the same natural wonders that I’ve enjoyed here over the years, I am deeply appreciative of the unified effort from our commissioners and staff in their fight to save our rivers and lakes,” said Kirk Klancke, president of the Colorado River Headwaters Chapter of TU. “I am proud of my county for having courageous leaders like these, who are an example to all of the Davids that are facing Goliaths.”

Nickum called Grand County “a longstanding and valued partner” with Trout Unlimited in working to protect and restore the Upper Colorado River watershed. He noted that Grand County officials have invested more than $3 million into assessing and addressing the needs of its rivers, and spent thousands of hours negotiating with Front Range water users and advocating to federal permitting agencies for better protections for the Upper Colorado River watershed.

Among other accomplishments in the past year, Grand County (along with other west slope governments and Denver Water) unveiled a historic “cooperative agreement” that includes many important benefits for the Colorado River and its tributaries, including millions of dollars for river restoration and environmental enhancement; 1,000 acre-feet of water to help with low flows in the Fraser River watershed; guarantees that the vital Shoshone call continues to operate in the future to keep water in the Colorado River year-round; and an agreement that any future transbasin projects will only be pursued with the consent of the West Slope. The agreement is also important in establishing a stakeholder partnership called “Learning by Doing” to provide ongoing monitoring of river health to ensure adequate protection measures.

Grand County has also worked with the Northern Colorado Water Conservancy District to use Windy Gap pumping capabilities to re-manage some “excess” water for the benefit of flows in the Colorado River and has filed for a Recreational In Channel Diversion to help support a new in-river water right on the Colorado mainstem.

Moreover, Grand County leaders are negotiating with Northern for enhanced funding for river restoration projects—including a needed bypass around Windy Gap Reservoir to improve Colorado River habitat—and additional water for use in Grand County to boost flows and river health. Grand County is also promoting an agreement to release water for endangered fish in the downstream Colorado River out of Granby Reservoir – thereby benefiting the Colorado through miles of key trout habitat – instead of releases solely from Ruedi Reservoir, as has been done in the past.

For all the progress in recent years, the health of the Upper Colorado River ecosystem will continue to decline unless further protections are put in place to address looming impacts from two new Front Range diversion projects, Denver’s Moffat Tunnel expansion and Northern’s Windy Gap Firming Project. Nickum noted that EPA recently issued recommendations that supported Grand County and TU’s case for stronger mitigation on the Windy Gap Firming Project.

“Grand County officials understand that the Colorado headwaters are the lifeblood of their communities and of our state’s tourism economy and outdoor quality of life,” said Nickum. “They have set an example for our public leaders of what strong river stewardship looks like.”

More Colorado River basin coverage here.


Northern Integrated Supply Project update: ‘The NISP project really fits like a glove on our water portfolio for the future’ — said Doug Short (Lafayette)

April 23, 2012

nisp2.jpg

From the Boulder Daily Camera (Breanna Draxler):

“The NISP project really fits like a glove on our water portfolio for the future,” said Doug Short, the public works director in Lafayette. The city is trying to diversify its water supply to prevent vulnerability from dependence on a single source, especially considering the unknown future impacts of climate change, Short said.

The proposed supply project would include two reservoirs, two pump plants and a series of pipelines aimed at providing water for the growing population east of the Rockies. “One way or another we’re going to need additional water,” said Brian Werner, of Northern Water, the organization proposing the project…

The proposed project would increase Northern Water’s storage capacity so it could collect more water in wet years, like last year, to be used in dry years, like this year. “We’re there for those dry times,” Werner said, equating Northern Water to a water supply savings account.

The proposed Glade Reservoir would store water from the Cache la Poudre River. Its location northwest of Fort Collins would require the relocation of seven miles of U.S. 287. The second proposed water storage facility, Galeton Reservoir, would be located northeast of Greeley and would collect water diverted from the South Platte River…

In addition to the economic costs, opponents fear environmental degradation related to the project. Laura Belanger, a water resources and environmental engineer at Boulder-based Western Resource Advocates, said diverting water from the rivers will be detrimental to the riparian ecosystems. “There will be no peak flows left in the Poudre River,” Belanger said.

Peak flows provide habitat and spawning areas for wildlife, she said, as well as move sediment and remove vegetation. “If you remove peak flows from a stream system, that stream system can’t survive,” Belanger said…

Belanger commended Northern Water and the project’s participating communities for their conservation efforts and outreach, and she said that these savings should be considered a larger portion of future water supplies. But Northern Water is unconvinced that it will be enough. Limiting water projects will not limit growth, Werner said. “We can’t conserve our way to future supply,” he said.

More Northern Integrated Supply Project coverage here and here.


Follow

Get every new post delivered to your Inbox.

Join 538 other followers

%d bloggers like this: