Colorado-Big Thompson Project update: Adams Tunnel deliveries off November 5, to resume after maintenance period

firstwaterfromadamstunnel1947.jpg

From the Sky-Hi Daily News:

Maintenance season for the Colorado-Big Thompson Project begins this November, with water diversions through the Adams Tunnel stopped on Nov. 5, according to Kara Lamb, spokesperson for the Bureau of Reclamation.

“This will temporarily slow the draw on Granby Reservoir because we will not be pumping up to Shadow Mountain Reservoir and the tunnel,” Lamb wrote in an email to interested parties. “Releases from Granby to the Colorado River should remain at or above 20 cfs at the Y gauge for the rest of the calendar year.”

All annual maintenance projects scheduled for this fall on the C-BT Project on the eastern side of the Divide start to wrap up the week of Dec. 7 through Dec. 14. At that time, diversions through the Adams Tunnel are scheduled to resume.

More Colorado-Big Thompson Project coverage here.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 989 other followers

%d bloggers like this: