Aspen’s original (c. 1890) Pelton Wheel now on on display

peltonwheel.jpg

From The Aspen Times:

A key part of Aspen’s former hydroelectric plant will go on display Tuesday in the Silver Queen Gondola Plaza.

The Pelton wheel hydroelectric turbine will be displayed starting at 10 a.m. The machinery was used around 1890 to convert falling water into electricity at the Castle Creek Hydroelectric Plant.

The historic equipment will be unveiled by Sam Perry, the great-grandson of DRC Brown, the original owner and operator of the Castle Creek plant. Perry is a Roaring Fork Valley native who is now president of Sollos Energy, which operates hydroelectric plants in other parts of the country.

The Pelton runner going on display is a smaller version of the same type of equipment that would be used in a proposed new Castle Creek hydroelectric plant.

More hydroelectric coverage here and here.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 536 other followers

%d bloggers like this: