Wet Mountain Valley: Round Mountain Water and Sanitation District board meeting recap

February 14, 2010

A picture named waterboosterstation.jpg

From the Wet Mountain Tribune (Nora Drenner):

Engineering firm Crabtree Group was invited to the table to discuss RMW’s projects over the last year. Those projects included the construction of the new Gallery Well south of town and the installation of a booster station in Silver Cliff to increase water pressure…In a separate matter, [RMW chairman Darrell Niles] asked why a drainage system had not been installed near the booster station.

More Custer County coverage here and here.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.

Join 193 other followers